Site icon 99.1 FM CKXS | Your Music Variety

Erosion Issues Could Prove Costly on Rose Beach Line

Erosion on Rose Beach Line is going to require the relocation of some water and waste water lines.

Rose Beach Line near Antrim Road.

The Public Utilities Commission has taken a broad look at the potential for the roadway to fail and take the underground infrastructure with it.

If that were to happen, a handful of homes and Wildwood trailer park would lose water service.

The park would lose sewer service too.

The options for rerouting both run between $1.7-million and $2.7-million.

A formal plan with more precise costing is expected to come to commission in the near future.

Exit mobile version