Erosion on Rose Beach Line is going to require the relocation of some water and waste water lines.
The Public Utilities Commission has taken a broad look at the potential for the roadway to fail and take the underground infrastructure with it.
If that were to happen, a handful of homes and Wildwood trailer park would lose water service.
The park would lose sewer service too.
The options for rerouting both run between $1.7-million and $2.7-million.
A formal plan with more precise costing is expected to come to commission in the near future.