Erosion on Rose Beach Line is going to require the relocation of some water and waste water lines.

Rose Beach Line near Antrim Road.

The Public Utilities Commission has taken a broad look at the potential for the roadway to fail and take the underground infrastructure with it.

If that were to happen, a handful of homes and Wildwood trailer park would lose water service.

The park would lose sewer service too.

The options for rerouting both run between $1.7-million and $2.7-million.

A formal plan with more precise costing is expected to come to commission in the near future.